
Very pleased with this project. Altogether, it took about 50-55 hours of labor. Well, that's not including the time spent picking and loading two trailer-loads of stone from property across town. Hard going, that, prying each stone up from the soil that is reluctant to loosen its grasp. But it was a little easier using a large garden cart that was outfitted with old bicycle tires. So at least I didn't have to walk every stone down to the road. I've taken a lot of stone out of that place, and just when you think that there can't be much more usable stone left --- stone that has the flat, slightly angular faces needed for a nice-looking wall, you find an untapped section that's loaded with them.
Have an interior wall lining coming up that I've already done some prep work on and need to get finished before the season ends and wood stove heating season begins.